Estimate type: concept to design development

Rough order of magnitude estimate and conceptual budgets

A rough order of magnitude estimate tells an owner whether a project is in the right range before design is finished. Bidmere builds ROM and conceptual budgets from early drawings, with every assumption written down.

Fixed price in 2 business hours. Pay only after you accept.

  • Fixed price agreed before any work starts
  • Plan review is free
  • You pay only after you accept the price and delivery date
  • Your cost data and rates, your final number
  • No files needed to get a quote

Get a fixed quote

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.
Prefer a call? Leave a number and a time
Optional. We still reply by email, and call only if you ask here.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Typical estimate accuracy ranges narrow as design developsAACE 56R-08 classes for building construction, by end use. Class 5 concept screening: low minus 20 to 30 percent, high plus 30 to 50 percent. Class 4: minus 10 to 20, plus 20 to 30. Class 3: minus 5 to 15, plus 10 to 20. Class 2: minus 5 to 10, plus 5 to 15. Class 1: minus 3 to 5, plus 3 to 10.Design developsHighLow+30 to +50%−20 to −30%Class 5Conceptscreening+20 to +30%−10 to −20%Class 4Schematic orconcept study+10 to +20%−5 to −15%Class 3Budgetauthorization+5 to +15%−5 to −10%Class 2Control orbid/tender+3 to +10%−3 to −5%Class 1Check, bid orchange orderTypical estimate accuracy ranges narrow as design developsAACE 56R-08 classes for building construction, by end use. Class 5 concept screening: low minus 20 to 30 percent, high plus 30 to 50 percent. Class 4: minus 10 to 20, plus 20 to 30. Class 3: minus 5 to 15, plus 10 to 20. Class 2: minus 5 to 10, plus 5 to 15. Class 1: minus 3 to 5, plus 3 to 10.Class 5Conceptscreening+30 to +50%−20 to −30%Class 4Schematic orconcept study+20 to +30%−10 to −20%Class 3Budgetauthorization+10 to +20%−5 to −15%Class 2Control orbid/tender+5 to +15%−5 to −10%Class 1Check, bid orchange order+3 to +10%−3 to −5%

Typical ranges from AACE International Recommended Practice 56R-08 for building and general construction, at an 80% confidence interval after contingency.

Estimate ranges, narrowing as design develops.

Quick answer

A rough order of magnitude estimate (ROM estimate) from Bidmere is an early construction budget built from concept, schematic or design development drawings. General contractors and design-build teams get cost by system or division, the pricing basis for each line, an assumptions register and the AACE estimate class. Multi-trade budgets are from $1,150, with a fixed quote first.

What is a rough order of magnitude estimate?

ROM stands for rough order of magnitude. A ROM estimate is the first cost number on a project, prepared when design is only a concept or a program. It answers one question: is this project roughly affordable, and in what range?

In AACE International’s classification for building and general construction (Recommended Practice 56R-08), a ROM usually falls in Class 5 or Class 4. Class 5 supports early concept screening. Class 4 supports schematic design and concept studies.

Other names you will hear for the same early number:

  • ROM estimate or order of magnitude estimate
  • Conceptual estimate
  • Budget ROM or preliminary estimate, when the early number seeds a first budget
  • Class D estimate, the Canadian term (see conceptual estimates)
  • Feasibility estimate

The names overlap. What matters is how mature the design is. AACE ties each class to the share of project definition complete, so readers know what the number can support.

How accurate is a ROM estimate? AACE estimate classes explained

A ROM estimate is a range, not a price. AACE RP 56R-08 gives typical accuracy ranges by class for building and general construction, at an 80% confidence interval after contingency.

Class Project definition Typical use Typical method Accuracy low Accuracy high
5 0% to 2% Concept screening Area-based factoring, parametric models, analogy -20% to -30% +30% to +50%
4 1% to 15% Schematic design, concept study Parametric and assembly models -10% to -20% +20% to +30%
3 10% to 40% Design development, budget authorization Semi-detailed unit costs, assembly line items -5% to -15% +10% to +20%
2 30% to 75% Control or bid at semi-detailed level Detailed unit costs, forced detailed takeoff -5% to -10% +5% to +15%
1 65% to 100% Check estimate, bid, change order Detailed unit costs, detailed takeoff -3% to -5% +3% to +10%

AACE notes these are reference ranges. A specific project’s range should come from risk analysis. A class label alone is not a promised accuracy.

Where the range comes from: the figures are Table 1 of AACE RP 56R-08. Each one is the typical variation of actual cost from the estimate at an 80% confidence interval, after contingency is applied. AACE writes that a Class 5 building estimate may have a range as broad as -30% to +50% or as narrow as -20% to +30%, and that on weak project systems or complex, risky projects the high range may be two to three times the table’s.

Preliminary vs ROM vs conceptual estimate

The three names are not standard terms, and firms use them differently. In common use they mark how far design has gone, which sets the method and the likely range.

Estimate Typical design stage Usual method Closest AACE class
ROM (rough order of magnitude) Program or concept, few or no drawings Cost per square foot or per unit from historical data Class 5 or Class 4
Conceptual estimate Concept or early schematic drawings Square foot, parametric or early systems pricing Class 5 or Class 4
Preliminary estimate Schematic design to design development Assemblies by building system, with some measured quantities Class 4 or Class 3
Bid estimate, for contrast Construction documents Detailed takeoff and unit costs Class 2 or Class 1

Because one firm’s preliminary estimate is another’s conceptual budget, ask which drawings a number is based on and which class it claims, then read its range in the table above. When the documents are complete enough to bid, see bid estimates.

ROM vs budget estimate, Class 5 and Class D

The US Government Accountability Office describes a ROM as an estimate made “when a quick estimate is needed and few details are available,” usually from historical information, and helpful for comparing high-level alternatives. It also warns that a ROM “should never be considered a budget-quality cost estimate” (GAO Cost Estimating and Assessment Guide).

How the other names relate to a ROM:

  • Order of magnitude estimate: the same estimate under a shorter name.
  • Conceptual estimate: GAO calls a ROM similar to the conceptual estimate that the Office of Management and Budget defines.
  • Budget estimate: comes later, from schematic or design development drawings, to authorize funding. AACE RP 56R-08 places budget authorization at Class 3. A “budget ROM” is a ROM used to set a first budget, so read it as a screening range until the design supports a Class 3 estimate.
  • Class 5 and Class 4: the US Department of Energy notes that at a project’s first decision point an estimate is typically Class 5 or Class 4, often a ROM for a preconceptual design or a feasibility study (DOE PM newsletter, December 2019).
  • Class D: the Canadian term for the same early-stage estimate. Housing, Infrastructure and Communities Canada defines Class D as an estimate at the conceptual design stage, the earliest of its Classes D to A (class estimates). The conceptual estimate guide covers the method.

When to use a ROM estimate, and when not to

Use a ROM when a decision needs a number before design exists:

  • Go or no-go on a site or a program before paying for design
  • Comparing high-level options, such as building type, size or number of stories
  • Testing an owner’s target budget against the program
  • A first number for a preconstruction pursuit

Do not use a ROM to authorize funding, set a contract amount or carry a bid. Move to a budget estimate once schematic or design development drawings exist, and to bid estimates at construction documents.

A ROM needs the building type, gross area or unit count, quality level, location, expected construction start for escalation, and any site information you have. What Bidmere returns is listed under what you send and what you get.

How is a conceptual estimate built?

A conceptual estimate prices what the design shows and states what it assumes for the rest. The method follows the documents available.

  1. Square foot or unit method. Cost per gross square foot, per unit, per bed or per parking stall, from historical or published data, adjusted for location and time.
  2. Parametric method. Costs driven by key parameters such as floor area, stories, perimeter, wall-to-floor ratio and site area.
  3. Assembly or systems method. Cost by building system: foundations, structure, enclosure, roofing, interiors, MEP, sitework. This is the usual method once schematic plans exist.
  4. Allowances. Fixed amounts for scope not yet designed, stated as allowances.
  5. Escalation and contingency. Added as factors you set for the schedule and the risk.

On early jobs, the assumptions register matters as much as the number. It tells the owner what is in the budget and what would change it.

Have plans for this scope? Send them over. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.

Get a fixed quote

Construction budget template: what a ROM budget should show

A useful construction budget template keeps the number and its basis together. Each line should show:

Show the rest of this section
  • Building system or MasterFormat division
  • Key quantity and unit, such as gross floor area in SF, roof area in SF or site area in acres
  • Pricing basis: square foot, parametric, assembly or unit cost
  • Unit cost and extended cost
  • Data source and date, so the number can be escalated later
  • Assumption for design not yet shown

Below the direct costs, show general conditions, contractor fee, design contingency, escalation and owner items separately. Mixing them into unit costs hides the risk the owner is carrying.

The free construction budget template from Bidmere follows this layout in Excel. Pair it with the construction estimate template once drawings reach design development.

What do early budgets usually miss?

Early budgets go wrong because scope is missing, not because unit costs are off. Check for these before the number goes to an owner:

Show the rest of this section
  • Structural system not selected, so foundations and frame are guessed
  • Mechanical and electrical described only in narrative
  • Site and utility work outside the building footprint
  • Off-site utility extensions and impact fees
  • Finish quality level not stated
  • Geotechnical conditions unknown, such as rock or poor soils
  • Code-driven items: fire sprinklers, fire alarm, accessibility upgrades
  • Phasing, occupied-building work or night shifts
  • Escalation to the midpoint of construction
  • Design and owner contingency kept separate from construction contingency

ROM and budget estimating service: what you send and what you get

Send the drawings you have and the cost data you trust. We return a budget organized by system, with the basis and assumptions written down. Your team sets contingency and decides how the number is used.

You send

  • Concept, schematic or design development plans
  • Program or outline specification, if available
  • Site information and any geotechnical findings
  • Historical costs or rates you approve
  • Target budget or design options to compare

You get

  • Budget summary by system or division, with the pricing basis on each line
  • Assumptions register for what the design does not show yet
  • Option comparison for design choices you ask us to test
  • Classification note stating the design stage and AACE class
  • Delivery as an Excel estimate with live formulas, color-coded marked-up PDF plans, and a written list of assumptions, exclusions and open questions

Not included: design or engineering decisions, market forecasts beyond the factors you approve, firm pricing commitments, and site visits. A budget is not a bid.

Sample takeoff

What a takeoff looks like

SystemQuantityUnitPricing basis
Foundations and slab on grade12,000SFAssembly, spread footings assumed
Structure: steel frame and roof deck12,000SFParametric by bay size
Exterior enclosure7,200SF wallAssembly, 40% glazing assumed
Roofing12,600SFUnit cost, TPO assumed
Interior construction and finishes12,000SFSquare foot, mid-grade finishes
Plumbing, HVAC, fire protection12,000SFSquare foot, narrative only
Electrical and low voltage12,000SFSquare foot, narrative only
Sitework and utilities1.8ACAllowance, no civil drawings

Fictional example: Class 4 ROM summary layout for an invented 12,000 SF one-story office. Quantities and bases only; unit costs come from data you approve.

Before you send plans

Common questions about handing off the work

Can a remote team price a project with so little design?

Yes, as long as the gaps are written down. Every line names its basis and assumption, so your team can adjust what it knows better.

Whose cost data is used?

Yours, or sources you approve. You set escalation, contingency and fee.

Will the owner treat this as a price?

The classification note states the AACE class and intended use, so the number is read as a budget range, not a bid.

Monthly estimating plans

Running preconstruction on several jobs? Use a monthly plan.

Design-build and preconstruction teams often need a budget at every design milestone. Monthly estimating plans cover recurring work: $1,395 per month for up to 6 bids, $2,595 per month for up to 12 bids or $4,795 per month for up to 25 bids, using your cost data every time.

Questions

Frequently asked questions

What is a ROM estimate in construction?

A ROM estimate, or rough order of magnitude estimate, is an early cost range built before design is far along. It is used to test feasibility and set a first budget. The US Department of Energy places a ROM in AACE Class 5 or Class 4, and AACE RP 56R-08 gives typical ranges as wide as -30% to +50% for a Class 5 building estimate.

What does ROM mean in construction?

ROM stands for rough order of magnitude. A ROM estimate is the first cost range on a project, built from a program or concept when few details are available. It is used to screen feasibility and compare options, not to authorize funding or price a bid.

Is a Class D estimate the same as a ROM?

Class D is the Canadian term for the same early-stage estimate, made at the conceptual design stage. US teams usually call it a ROM or conceptual estimate and place it in AACE Class 5 or Class 4.

What is the difference between a ROM estimate and a budget estimate?

The terms overlap. A ROM is usually the earliest number, from a program or concept. A budget estimate is often built from schematic or design development drawings and used to authorize funding, which AACE places around Class 3. The design stage, not the label, sets what the number can support.

How accurate is a conceptual estimate?

It depends on design maturity, project risk and the quality of cost data. AACE RP 56R-08 gives reference ranges, such as -20% to -30% low and +30% to +50% high for Class 5. AACE says a specific project’s range should come from risk analysis. A class label is not a promised accuracy.

How much does a ROM estimate cost?

Multi-trade budgets from Bidmere are from $1,150, and a single-system budget is priced from $195. You get a fixed quote within 2 business hours after we review your drawings, and you pay only after you accept the fixed price and delivery date.

What do I need to send for a budget estimate?

The current design documents, any program or outline specification, site information, and the cost data or rates you want used. Add your target budget or design options if you want them compared. You approve the assumptions, contingency and escalation before the number is used.

Is there a free construction budget template?

Yes. Bidmere’s free construction budget template is an Excel sheet organized by building system, with columns for quantity, unit, pricing basis, unit cost, data source and assumption. Contingency, escalation and fee sit below the direct costs. It opens in Google Sheets.

Can you update the budget as design progresses?

Yes. Each design milestone is quoted as its own update. We carry the assumptions register forward, mark what the new drawings resolved and show what moved. That gives the owner a clear trail from the first ROM to the bid-day number.

Do you use cost per square foot data?

When the design is only a program, yes, from sources you approve, adjusted for location and date. Published per square foot ranges are a starting point, not an answer. As soon as plans exist, we move to assemblies and measured quantities.

Get a fixed quote

Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.
Prefer a call? Leave a number and a time
Optional. We still reply by email, and call only if you ask here.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Fixed price in 2 business hoursGet a quote