What evaluators look for in construction past performance
Owners evaluate past performance to judge how likely you are to perform this contract well. In federal negotiated procurements, FAR 15.305 says the evaluation considers the currency and relevance of the information, its source, its context and general trends in the contractor’s performance. State and local RFQs ask for the same things in plainer terms.
- Relevance: similar project type, size, delivery method and complexity.
- Recency: completed or substantially performed within the period the solicitation sets.
- Your role: prime, subcontractor or joint venture partner, and the work you self-performed.
- Verifiable references: owner contacts who can confirm the facts.
A simple structure for each project write-up
Use the same order for every project so evaluators can scan them:
- Project facts: name, owner, location, dates and contract value.
- Scope: one or two sentences on what you built and self-performed.
- Relevance: why this project matches this solicitation, in the owner’s own terms.
- Challenge and approach: the hard part, such as phasing in an occupied building, and how your team handled it.
- Outcome: facts you can support with records, such as substantial completion date against contract date.
- Reference: name, title and current contact details.
If the solicitation provides a form, use the form. Do not reformat it.
Fictional example: a past performance write-up
Fictional example, for illustration only. All names and facts are invented.
Lakeside Middle School HVAC replacement, Lakeside School District. Prime contractor, $2.4M, completed August 2025.
Replaced rooftop units, ductwork and controls in a 90,000 SF occupied school. Self-performed mechanical and controls work.
Relevance: like this solicitation, the work was phased around an occupied school with a summer completion deadline.
Approach: split the work into four summer phases, with crane lifts scheduled on weekends.
Outcome: substantial completion five days before the contract date, per the owner’s completion certificate.
Reference: facilities director, Lakeside School District, with current phone and email.
Short on time? Bidmere can do this for you. Bid and proposal packages from $1,950, ready in 5 business days. See construction RFP proposal writing or get a fixed quote.
Past performance mistakes that cost points
- Generic descriptions reused without tailoring to this owner’s criteria.
- Claims you cannot back with records or a reference.
- Outdated reference contacts, or references who were never asked.
- Vague roles. If you were a sub, say so and say what you did.
- Ignoring page limits, required forms or the number of projects requested.
- Choosing the biggest projects instead of the most relevant.
How to choose which projects to include
Pick projects by how well they match this solicitation, not by size or prestige. Score each candidate against the evaluation criteria before writing.
| Criterion | Question to ask |
|---|---|
| Project type | Same building type or work type as this project? |
| Size | Similar contract value, square footage or quantities? |
| Delivery method | Same method, such as design-bid-build, CMAR or design-build? |
| Conditions | Occupied site, phasing, security or remote location like this one? |
| Recency | Inside the period the solicitation sets? |
| Reference | A current contact who will confirm the facts? |
A project that matches four or five criteria usually beats a larger one that matches two. If the solicitation asks for projects led by the proposed staff, check that the people on each project are on this team.
Build a project library before the next RFP
A current record for each completed project makes every proposal and statement of qualifications faster. For each project keep: contract value, dates, scope, your role, self-performed trades, photos you have rights to use, completion documents and reference contacts confirmed in the last year.
Update it at closeout, while the facts are fresh. Ask the owner at closeout whether they will act as a reference.
How Bidmere helps with past performance
Bidmere drafts project write-ups from your records and maps each one to the evaluation criteria in a compliance matrix. It does not invent projects, outcomes or references. Your team confirms every fact before the response goes out.
Past performance sections are part of RFP proposal preparation and qualifications packages. Bid packages are priced from $1,950 and are ready in 5 business days, with a fixed quote within 2 business hours.
Frequently asked questions
How many past projects should I include?
Follow the solicitation. Many specify a number of projects or a page limit. If not, choose the most relevant three to five rather than the most impressive. One closely matched project with a strong reference often scores better than five loosely related ones.
Can I use projects where we were a subcontractor?
Usually yes, if you state your role clearly and describe only the work you performed. Some solicitations limit past performance to prime contracts or count subcontract work differently, so read the instructions. Never present a subcontract as if you were the prime.
What if the owner contact has left?
Provide a current contact at the owner organization who can verify the project, such as the facilities manager or project manager who took over. Confirm they agree to be contacted. An unreachable reference can cost more than leaving the project out.
How recent should past performance be?
Use the period the solicitation sets. Many ask for projects completed within the last three to five years. If no period is stated, favor recent work and note the completion date clearly. Older projects can still help if they are uniquely relevant.
Can past performance include numbers like safety rates?
Yes, if you can document them. Safety records, schedule performance and change order history help when they come from your records or owner documents. Do not round up, estimate or borrow figures. Evaluators may check, and an unsupported claim hurts credibility.
Should past performance match the proposed team?
Where you can, yes. Many owners score projects higher when the proposed project manager or superintendent led them. Name the people from each project who are on this team, and make sure their resumes list the same projects with the same dates and roles. Mismatches between sections are easy for evaluators to spot.
Will Bidmere write past performance from my old proposals?
Yes, as a starting point. Send previous write-ups, closeout documents, contract values and reference details. Bidmere tailors each project to the new evaluation criteria, in the owner’s terms, and flags any fact that needs confirming. Your team approves every claim before the proposal is submitted.