Bid process: pre-bid meetings

Pre-bid meeting checklist: before, during and after the site visit

The pre-bid meeting is often your only chance to see the site and surface scope questions before you price. Only written answers count.

Short answer

A pre-bid meeting checklist covers what to do before, during and after an owner’s pre-bid conference and site visit: confirm whether attendance is mandatory, read the documents and list questions, sign in, record existing conditions, and submit questions in writing. Statements made at the meeting usually do not change the bid unless the owner issues an addendum.

Want the bid estimate done for you? Single-trade estimates from $195, ready in 48 hours. Fixed quote within 2 business hours, and you pay only after you accept. See bid estimate services.

Get a fixed quote

What is a pre-bid meeting?

A pre-bid meeting, also called a pre-bid conference, is a meeting the owner holds before bids are due, often with a site visit. Bidders sign in, see existing conditions, ask scope questions and hear the questions other bidders ask. Answers that change the bid documents come later, in writing, as an addendum.

Is the pre-bid meeting mandatory?

Check the solicitation first. Some owners make the pre-bid meeting or site visit mandatory and reject bids from companies that did not attend or sign in. Others make it optional but strongly recommended.

Look for: whether attendance is mandatory, who may attend for your company, sign-in rules, and whether a subcontractor can attend on your behalf. Some owners require a representative of the prime bidder. If the rule is unclear, ask in writing before the meeting.

Pre-bid meeting checklist: before the meeting

A pre-bid meeting is only as useful as the questions you bring.

  • Read the plans, specifications, bid form and instructions to bidders.
  • Do a first-pass takeoff on the trades you carry, so quantity questions are specific.
  • List scope gaps, conflicts between drawings and specs, and missing details.
  • Note access, laydown, working hours, phasing and occupied-space questions.
  • Check the schedule, liquidated damages and any long-lead items.
  • Coordinate with key subcontractors who need to see the site.
  • Bring the solicitation number, business cards and a way to record attendance.

At the meeting and site visit: what to record

Treat the visit as evidence gathering. Record what you see, not just what you hear.

  • Sign the attendance sheet and record who represented your company.
  • Photograph existing conditions where permitted: finishes, ceilings, roof access, utilities, site access.
  • Measure or confirm key dimensions the drawings leave unclear.
  • Note conditions the drawings do not show, such as hidden demolition or hazardous material notes.
  • Ask your questions on scope gaps, conflicts and schedule constraints.
  • Note the deadline and method for written questions.
  • Get the attendee list if the owner shares it. It tells you who you are bidding against and which subs to call.

Existing conditions drive the demolition scope; see demolition estimating.

Only written answers change the bid

Verbal answers at a pre-bid meeting rarely bind anyone. In federal sealed bidding, FAR 14.207 says information given at a pre-bid conference that changes the invitation must be furnished as an amendment, and nothing said at the conference changes the invitation unless an amendment is issued. Many state and local owners follow the same principle.

Submit important questions in writing by the stated deadline. Price from the written addenda, not from what someone said on the walk.

Short on time? Bidmere can do this for you. Trade estimates from $195, ready in 48 hours. See bid-day estimates or get a fixed quote.

After the meeting: turn notes into pricing

The day after the meeting is when the visit pays off.

  1. Send written questions before the deadline.
  2. Add site findings to your takeoff notes and estimate assumptions.
  3. Share photos and access notes with your subcontractors.
  4. Add allowances or line items for conditions the drawings do not show, labeled as assumptions.
  5. Watch for the addendum that answers the questions, then update quantities and quotes.

What contractors commonly miss on a site visit

  • Ceiling heights and above-ceiling congestion that change lift needs and labor.
  • Distance from parking or laydown to the work area.
  • Elevator, loading dock and working hour limits in occupied buildings.
  • Existing finishes that need removal before new work.
  • Utility shutdown requirements and who coordinates them.
  • Roof access and fall protection for rooftop work.

Pre-bid meetings for subcontractors

Subcontractors often skip the owner’s pre-bid meeting and rely on the general contractor’s notes. That is risky when your trade depends on existing conditions.

  • Ask the GCs you are bidding to whether you may attend with them, or attend on your own if the owner allows.
  • If you cannot attend, ask a GC for the sign-in sheet, photos and the written questions list.
  • Send trade-specific questions through the GC before the question deadline.
  • Price only from issued addenda, and state in your quote which addenda you included.

The attendee list is also a sales tool. It shows which general contractors are bidding the job, so you know who to send your quote to.

How Bidmere helps after the pre-bid meeting

Bidmere does not attend pre-bid meetings or visit sites. Send your meeting notes, photos and written questions with the bid documents, and Bidmere uses them in the takeoff and assumptions. On bid packages, pre-bid requirements and open questions go into the requirement tracker and are updated when addenda arrive. Single-trade bid-day estimates are priced from $195 in 48 hours.

Frequently asked questions

Do I have to attend a pre-bid meeting?

Only if the solicitation makes it mandatory. If it is mandatory, missing it or failing to sign in can get your bid rejected. Even when optional, attending is usually worth it, because you see existing conditions, hear other bidders’ questions and learn which subcontractors are pricing the job.

Are verbal answers at a pre-bid meeting binding?

Usually not. In federal sealed bidding, FAR 14.207 says information that changes the invitation must be issued as an amendment. Many state and local owners follow the same rule. Submit important questions in writing and price from the written addendum that answers them.

Can I send a subcontractor to a mandatory site visit?

Check the solicitation. Some owners require a representative of the prime bidder to sign in, and a subcontractor’s attendance will not count for you. If the rule is unclear, ask the owner in writing before the meeting, and keep the answer.

What should I bring to a pre-bid meeting?

Bring the solicitation number, a marked-up set of plans with your questions, a camera or phone for photos where allowed, a tape or laser measure, and business cards. Bring a written question list so you do not forget the ones that affect price.

What questions should I ask at a pre-bid meeting?

Ask questions that change price or schedule: unclear scope boundaries, conflicts between drawings and specifications, access and working hours, phasing in occupied areas, utility shutdowns, and long-lead items. Then submit the same questions in writing, so the answers come back as an addendum.

Can Bidmere use my site visit notes in the estimate?

Yes. Send photos, measurements and notes with the bid documents. Bidmere uses them in the takeoff and lists any condition not shown on the drawings as a stated assumption. Bidmere does not visit sites, so your notes are the record of existing conditions.

Get a fixed quote

Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.
Prefer a call? Leave a number and a time
Optional. We still reply by email, and call only if you ask here.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Need it done? Fixed price in 2 hoursGet a quote